Permeability analysis in reduced dock models through piezometric height
DOI:
https://doi.org/10.6008/CBPC2318-3055.2018.002.0004Keywords:
Percolation, Earth Dams, Physical Model, PiezometerAbstract
Introducing itself as one of the most complex works of civil engineering, as dams are built along the transverse axis, towards the flow of a watercourse, designed as an artificial reservoir. Serving basically two desios: regularization and retention. Following the precepts, this research has as objective the creation of reduced physical prototypes, simulating earth dams and end of analysis of some of the phenomena that occur in them. The construction will be done with sandy and clayey soil, since the experiments will only be used in various proportions. In order to perform the analysis of a main method, an analysis of how the behavior of the water between the soils will be in order to perform the piezometric readings. As the exits were done every 5 minutes, totaling 10 readings. For the expanded the total capacity of the measurement and the barracation and the measurement of the barrage and the measurement of the barrage and heavy metal system. a reduced model in the laboratory.
Downloads
Downloads
Published
Issue
Section
License
The CBPC - Companhia Brasileira de Produção Científica (Brazil CNPJ: 11.221.422/0001-03) the material rights of the published works. The rights relate to the publication of the work anywhere in the world, including rights to renewals, expansions and dissemination of the contribution, as well as other subsidiary rights. All electronically published works may subsequently be published in printed collections under the coordination of this company and / or its partners. The authors preserve the copyright, but are not allowed to publish the contribution in another medium, printed or digital, in Portuguese or in translation.